Newell Pathway in Parkmead to get a face-lift

About two weeks ago, the Parkmead Community Association (PCA) convened to discuss the crumbling granite of the Newell Pathway that kids use to walk to Parkmead, Tice Creek and Las Lomas. The path has been whittled away by rain and primarily the postal truck creating large ruts.

A few years ago, the PCA was able to repair a portion between Magnolia and the Tice Creek exit, but the entire thing is still in need of updating. Since people – especially students going to and from school – use the path daily, it has become imperative that the granite be fixed.

After many meetings and a walk along the path with the country engineers, who had conversations with County Supervisor Candace Anderson, she was able to secure one-time funding to repair the entire pathway. There were about 35 people in a meeting we thought were to discuss our options, however the county representative had a very satisfactory solution. There is still a need to find a long-term solution, but we have bought time with this outcome.


Country representatives Jason Yee and Mary Halle (a resident of Parkmead), as well as Anderson – her back is to us left side front row, were present at the meeting. Repair work will bring the water meters level, eliminate the puddles of water, and add to the surface of the decomposed granite.   Work is expected to begin sometime in April.

SaveSave